PepStak is live · Now on the App StoreNow on the App Store Download →
Now available on the App Store

Your protocol,
perfected.

A native iOS app built by the peptide community. Track doses, reconstitute with confidence, and watch your transformation unfold — offline-ready and privacy-first.

Peptides100+
Injection sites26
Core appFree
PepStak home screen running two stacks with adherence rings and one-tap dose logging
Native SwiftUI · iOS
What's inside

Built for people who measure everything.

Spreadsheets, janky calculators, and apps that sell your data — that's what this replaces. Five tabs, one job: keep your protocol precise.

Dose helper — always free

Draw to the exact unit mark.

No more guessing with syringes and calculators. Pick your peptide, enter your BAC water and target dose, and PepStak answers the only question that matters: "Measure to the 80-unit mark" — drawn on a U-100 syringe so you can see exactly where to pull the plunger.

The full breakdown shows concentration, mcg per unit, volume to inject, and how many doses are left in the vial.

U-100 syringe view · full breakdown · free forever
PepStak dose helper showing a U-100 syringe filled to the 80-unit mark with step-by-step draw instructions
Stacks

Run your whole stack at once.

Multiple concurrent stacks, each with its own cycle progress, per-peptide schedules, and adherence rings. The home screen shows what's due today across everything you're running — and logging is one tap.

Weekly schedules with reminders keep every compound on time, whether it's daily Ipamorelin or Monday-only Retatrutide.

Concurrent stacks · adherence rings · scheduled reminders
PepStak home screen running two stacks with adherence rings and one-tap dose logging
Active levels

Know what's still active.

Every dose decays. PepStak models it — decay curves built from published half-life data estimate what's still circulating from every compound you've logged, with peak and trough at a glance.

Isolate any peptide's curve, scrub across 24-hour to 90-day windows, and see exactly how doses overlap. Modeled estimates for insight — not medical advice.

Half-life models · peak & trough · 24h–90d views
PepStak active levels chart showing a half-life decay curve for Retatrutide with peak and trough
Site rotation

Rotate sites like a pro.

The body map remembers every injection and color-codes each site's recovery — needs rest, caution, ready soon, good to go. Front and back, tracked automatically.

Pick a site that was used too recently and PepStak warns you — and tells you which one is ready instead. No more tissue buildup from favoring the same spot.

Front & back map · recovery states · smart warnings
PepStak injection site body map with color-coded recovery states and a rest warning
Progress tracking

Watch the trend bend.

Weight and body fat percentage on one chart, from one week to all time — with total change and weekly-average rate so you know if the protocol is actually working.

Daily check-ins across six metrics feed Smart Insights that surface patterns automatically: loss rate, logging consistency, protocol adherence.

Weight + body fat % · avg/week · HealthKit sync
PepStak weight tracker showing six months of weight and body fat trends with weekly averages
Progress photos

Visual proof it's working.

Numbers tell part of the story — photos tell the rest. Compare side-by-side across weeks and months to see changes the mirror hides.

Every photo stays on your device, backed up via your own iCloud. Your images never touch our servers — complete privacy for your most personal data.

On-device · iCloud backup · side-by-side compare
PepStak progress photos tab
As seen on the App Store

Every screen, at a glance.

The same walkthrough you'll find on the App Store listing. Scroll through to see stacks, live levels, the body map, and the dose helper in action.

Peptide tracking, done right — PepStak home screen with Longevity, Cut, and Recovery stacks and a half-life engine inside
Watch your progress — weight tracker showing 25.5 lbs lost over six months, synced with Apple Health
Rotate injection sites — 26-site body map with 7-day rotation zones
Never miss a dose — smart schedules and reminders for every peptide in your stack
See real-time peptide levels — half-life curves charted from your logged doses with peak and trough
Dialed in looks like this — precision peptide tracking
Know what's active — every peptide's curve modeled on a 7-day levels chart
100+ peptides built in — dosing ranges and reference data, plus your own custom peptides
What users are saying — quotes from PepStak users about simplicity, daily reminders, and reconstitution
Calculate exact doses — reconstitution screen telling you to measure to the 40-unit mark
Swipe to browse →
Try it now — free

The math, solved.

This is the question PepStak answers a hundred times a day. Try it right here — no account, no download. The full calculator with vial tracking and 100+ peptide presets lives in the app and on the calculator page.

20units
25.0 mcg per unit · ≈ 10 doses per vial

Assumes a standard U-100 insulin syringe (1 unit = 0.01 mL). Estimates for convenience only — not medical advice.

Your data, your rules

We will never sell your data. Period.

PepStak exists to serve you — not advertisers. Your protocols, your doses, your progress photos belong to you and only you. No third-party data sharing. No ad tracking. Ever.

No data sales On-device first Zero ad tracking
Why PepStak

Built for peptides. Not adapted to them.

Spreadsheet Generic med tracker PepStak
Reconstitution mathDIY formulas—Built in
Injection site rotation——26-site map
Active-level estimates——Half-life models
Peptide reference library—Rx drugs only100+ peptides
Cycles & schedulesManualSimple remindersStacks & cycles
Weight & photo progressCharts, DIY—Built in
No ads, no data salesYesVariesGuaranteed
The library
100+Peptides and blends

Every entry ships with vial sizes, typical dose ranges, half-life data, and reconstitution info — and anything we don't have, you can add as a custom peptide.

Track weekly GLP-1s and daily compounds side by side, with weight and body fat trends that show whether it's working.

Retatrutide Semaglutide Tirzepatide AOD-9604 5-Amino-1MQ Adipotide + more

Injury and tissue-repair protocols with site rotation that protects healing tissue and schedules that keep twice-daily dosing on time.

BPC-157 TB-500 GHK-Cu ARA-290 Adamax + more

Growth hormone secretagogue stacks with overlapping half-lives — exactly what the active-levels chart was built to untangle.

CJC-1295 Ipamorelin Tesamorelin Sermorelin AICAR + more

Long-horizon protocols where consistency is everything — cycles, adherence scores, and multi-month trend views keep you honest.

Epithalon MOTS-c GHK-Cu DSIP PT-141 + more
On the roadmap

And we're just getting started.

Built by the community

"PepStak isn't built by a faceless corporation. It's built by someone who was tired of spreadsheets, janky calculators, and apps that sell your data. Every feature exists because real users asked for it."

— The founder, who actually uses peptides

Works offline Local-first Community-driven
Simple pricing

Start free. Upgrade when you're ready.

The core app is free — no trial clock, no credit card. Pro is for running multiple stacks with deep analytics.

Free
$0Forever

The full core experience — track a stack from first mix to final dose.

  • One active stack with schedules & reminders
  • Reconstitution calculator & dose helper
  • Dose logging with 26-site rotation map
  • Weight tracking & progress photos
  • 30 days of history

Prices in USD · cancel anytime through the App Store

From the community

What users are saying.

"This app is amazing and really helps me with reconstituting my peps. I can't find a better tracking app, and it's great for stacking."
— Candace, early user
"What sold me was how simple it is — just my doses, my timing, my history, right there when I need it."
— Gabriel, early user
"I use the app every day — it helps me remember when to take all of my peps in an organized fashion."
— Briana, early user
"I don't know what I would do without this app. It's great that we finally have a peptide tracking app built by someone that actually gets it."
— Claudia, early user
FAQ

Questions, answered.

Is PepStak available now?
Yes. PepStak launched on the App Store on September 15, 2026. Download it from the App Store — the core app is free, no invite needed. Feedback from early users directly shapes what we build next.
What is PepStak?
PepStak is an iPhone app for tracking peptide use. It brings your entire routine into one place: reconstitution math, dose schedules and reminders, injection logging with site rotation, estimated active levels, daily wellness check-ins, weight and progress photos. If you're currently juggling a notes app, a spreadsheet, and a syringe calculator website, PepStak replaces all three.
Is PepStak free?
Yes. The core app is free: build a stack, schedule doses, use the reconstitution calculator, log injections with site rotation, track your weight, and take progress photos — no payment required. PepStak Pro is an optional subscription that unlocks unlimited stacks, full history, smart insights, data export, photo compare, advanced charts, and weekly summaries.
Which peptides are supported?
PepStak ships with a reference library of 100+ peptides and blends — with typical dose ranges, half-life data, and reconstitution info compiled from published research and community resources. Not in the library? Add it as a custom peptide and track it like any other.
Does PepStak tell me what to take?
No. PepStak never recommends, prescribes, or suggests peptides, doses, or protocols. You decide your protocol (ideally with your healthcare provider); PepStak helps you track it accurately and consistently. The reference library is informational only.
What are "active levels"?
PepStak uses each peptide's half-life to estimate how much is still active in your system based on your logged doses, shown as a real-time chart. It's a mathematical approximation for your convenience — not a lab measurement, and not something to base medical decisions on.
Is my data private?
Yes. Your logs, photos, and check-ins are yours. Data is stored on your device and synced securely to your account so it's available across your devices. We don't sell your data, and your health information is never shared with advertisers. You can lock the app behind Face ID for an extra layer of privacy. Full details in our Privacy Policy.
Does PepStak work with Apple Health?
Yes. PepStak can write your weight and body fat entries to Apple Health, and read body fat and sleep data to enrich your daily check-ins. Health integration is optional and controlled by you through iOS permissions.
Is there an Android version?
It's on the way — an Android version is currently in development. PepStak is iPhone-only for now; join the list below to be notified the moment the Android beta opens.
Does PepStak sell peptides?
No. PepStak doesn't sell, supply, or endorse any peptide or substance, and we're not affiliated with any vendor. We make tracking software — where you source anything, and whether it's legal where you live, is entirely your responsibility.
Is this medical advice?
No. PepStak is a personal logging and tracking tool — it is not a medical device and does not provide medical advice, diagnosis, or treatment. Calculations and estimates are approximations and may be inaccurate. Always consult a qualified healthcare provider before starting, stopping, or changing any protocol. See our Terms of Use for details.
Stay in the loop

Get updates.

Get new features and app updates first — and be the first to know when the Android beta opens. Tell us what you're interested in so we can tailor what we send.